CTH KB over NESHOTA RIVER

2.6M E JCT CTH R · County 009, Wisconsin · Built 1948 · 2 Lanes · 1,800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B05000800000000
Year Built
1948
Length
22.1 m (72.5 ft)
Max Span
21.9 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
1,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$283,000
Total Project Cost
$425,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.