CTH O over SPRING CREEKWATERWAY

0.09 W OF STH 58 S. (COUN · County 057, Wisconsin · Built 2024 · 2 Lanes · 99 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B29017100000000
Year Built
2024
Length
6.6 m (21.7 ft)
Max Span
6.4 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
99
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.