CTH O over STEWART CREEK

1 MI W JCT STH 58 · County 057, Wisconsin · Built 2022 · 2 Lanes · 540 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B29016700000000
Year Built
2022
Length
6.5 m (21.3 ft)
Max Span
6.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
540
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$104,000
Total Project Cost
$156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.