STH 54 WB over IH 94

4.7M W JCT CTH K · County 053, Wisconsin · Built 1997 · 2 Lanes · 7,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B27011600000000
Year Built
1997
Length
62.6 m (205.4 ft)
Max Span
30.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
7,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.