STH 54 EB over IH 94

1.0M E JCT USH 12 TO E · County 053, Wisconsin · Built 1968 · 2 Lanes · 7,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B27004500000000
Year Built
1968
Reconstructed
1987
Length
62.2 m (204.1 ft)
Max Span
30.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
7,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.