CTH H over TURTLE RIVER

4.5M N JCT USH 51 · County 051, Wisconsin · Built 1996 · 2 Lanes · 546 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
B26002800000000
Year Built
1996
Length
17.3 m (56.8 ft)
Max Span
16.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
546
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.