CTH FF over TURTLE RIVER

5.5M S JCT USH 51 · County 051, Wisconsin · Built 1967 · 2 Lanes · 782 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B26000300000000
Year Built
1967
Length
21.9 m (71.9 ft)
Max Span
21.8 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
782
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.