CTH I over SPRING VALLEY CREEK

0.9M S JCT CTH P · County 049, Wisconsin · Built 1940 · 2 Lanes · 379 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B25007400000000
Year Built
1940
Reconstructed
1991
Length
18.3 m (60 ft)
Max Span
9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
379
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.