CTH I over NORWAY CREEK

0.4M N JCT CTH II · County 049, Wisconsin · Built 1979 · 2 Lanes · 263 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B25004200000000
Year Built
1979
Length
11.3 m (37.1 ft)
Max Span
10.7 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
263
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.