CTH F over WATERCRESS CREEK

0.1M E JCT STH 67 · County 039, Wisconsin · Built 1925 · 2 Lanes · 1,308 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B20068600000000
Year Built
1925
Reconstructed
1976
Length
9.8 m (32.2 ft)
Max Span
9.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,308
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$153,000
Total Project Cost
$229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.