CTH S over MINK CREEK

1.1M E JCT CTH A · County 117, Wisconsin · Built 1922 · 2 Lanes · 330 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
B59029700000000
Year Built
1922
Reconstructed
1992
Length
7.4 m (24.3 ft)
Max Span
6.8 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
330
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$113,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.