CTH M over FOND DU LAC RIVER
0.9M N JCT ROSE ELD RD · County 039, Wisconsin · Built 2024 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
43.834481, -88.7192
This bridge is in worse condition than 25% of bridges in County 039. The average bridge in Wisconsin is 0 years old; this one is 2 years old.
Nearby Bridges
LRD OLDEN RD over W BRANCH FOND DU LAC RIV
Built 2018
STH 26 over W BR FOND DU LAC RIVER
Built 2023
LRD FREMONT RD over W BR FOND DU LAC RIVER
Built 1958
LRD SILVER CREEK R over SILVER CREEK
Built 1950
STH 23 EB & WB over SILVER CREEK
Built 2015
CTH C over W BR FOND DU LAC RIVER
Built 2001
LRD RIGGS PARK RD over TRIBUTE TO SILVER CREEK
Built 2004
LRD DOUGLAS ST over SILVER CREEK
Built 1995
LRD SCOTT ST over SILVER CREEK
Built 1991
CTH M over W BR ROCK RIVER
Built 1929
Bridge Details
- Structure #
- B20025200000000
- Year Built
- 2024
- Length
- 14.5 m (47.6 ft)
- Max Span
- 13.7 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.