STH 26 over W BR FOND DU LAC RIVER
2.0M N JCT STH 23 · County 039, Wisconsin · Built 2023 · 2 Lanes · 11,100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.836667, -88.675
This bridge is in worse condition than 18.7% of bridges in County 039. The average bridge in Wisconsin is 0 years old; this one is 3 years old.
Nearby Bridges
LRD FREMONT RD over W BR FOND DU LAC RIVER
Built 1958
LRD OLDEN RD over W BRANCH FOND DU LAC RIV
Built 2018
CTH M over FOND DU LAC RIVER
Built 2024
CTH C over W BR FOND DU LAC RIVER
Built 2001
LRD LINCOLN ROAD over IH 41 NB
Built 2001
IH 41 SB over CTH N
Built 1999
USH 41 NB over CTH N
Built 1999
LRD SILVER CREEK R over SILVER CREEK
Built 1950
STH 26 over EIGHT MILE CREEK
Built 1964
STH 23 EB & WB over SILVER CREEK
Built 2015
Bridge Details
- Structure #
- B20023900000000
- Year Built
- 2023
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 11,100
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.