LRD CTH T (4TH ST) over DE NEVEU CREEK

1.4M W JCT USH 151. 0.9 M · County 039, Wisconsin · Built 1992 · 2 Lanes · 4,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B20010900000000
Year Built
1992
Length
13 m (42.7 ft)
Max Span
12.4 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
4,800
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.