CTH V (RIENZI RD) over DE NEVEU CREEK
1.1M W JCT USH 151 · County 039, Wisconsin · Built 1967 · 2 Lanes · 1,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
43.762136, -88.415386
This bridge is in worse condition than 90.5% of bridges in County 039. The average bridge in Wisconsin is 0 years old; this one is 59 years old.
Nearby Bridges
LRD S NATIONAL AVE over DENEVEU CREEK
Built 1989
LRD CTH T (4TH ST) over DE NEVEU CREEK
Built 1992
LRD 2ND ST over DE NEVEU CREEK
Built 1961
CTH T over USH 151
Built 2016
USH 45 over USH 151
Built 2004
USH 151 SB over DENEVEU CR
Built 2004
USH 151 NB over DENEVEU CR
Built 2004
USH 151 NB over TAYCHEEDAH CREEK
Built 2003
USH 151 SB over TAYCHEEDAH CREEK
Built 2003
LRD DIVISION ST over DE NEVEU CREEK
Built 1982
Bridge Details
- Structure #
- B20005100000000
- Year Built
- 1967
- Length
- 18.6 m (61 ft)
- Max Span
- 17.8 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $246,000
- Total Project Cost
- $369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.