LRD MITCHELL RD over TAYLOR CREEK

0.2M W CTH B · County 035, Wisconsin · Built 2002 · 2 Lanes · 153 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B18016900000000
Year Built
2002
Length
35.5 m (116.5 ft)
Max Span
34.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
153
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.