IH 94 EB over STH 37-STH 85

5.8M E JCT CTH EE TO N · County 035, Wisconsin · Built 1966 · 3 Lanes · 13,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B18002500000000
Year Built
1966
Reconstructed
1996
Length
58.6 m (192.3 ft)
Max Span
17.5 m
Width
16.1 m (52.8 ft)
Lanes
3
Daily Traffic
13,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$783,000
Total Project Cost
$1,175,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.