LRD FARWELL ST over EAU CLAIRE RIVER
4.2M E JCT USH 12 · County 035, Wisconsin · Built 1985 · 4 Lanes · 8,950 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.813889, -91.5
This bridge is in worse condition than 45.5% of bridges in County 035. The average bridge in Wisconsin is 0 years old; this one is 41 years old.
Nearby Bridges
LRD DEWEY ST over EAU CLAIRE RIVER
Built 1931
LRD BARSTOW ST over EAU CLAIRE RIVER
Built 1987
USH B12-MADISON ST over CHIPPEWA RIVER 10
Built 1924
LRD LAKE ST over CHIPPEWA RIVER 09
Built 1972
LRD HASTINGS WAY S over LRD GALLOWAY ST
Built 2003
LRD HASTINGS WAY N over LRD GALLOWAY STREET
Built 2002
LRD S EDDY ST over UP RR
Built 1967
LRD WATER ST over CHIPPEWA RIVER
Built 2016
LRD GRAND AVE over HALF MOON LAKE
Built 2017
LRD HASTINGS WAY S over EAU CLAIRE RIVER
Built 2002
Bridge Details
- Structure #
- B18010900000000
- Year Built
- 1985
- Length
- 66.8 m (219.2 ft)
- Max Span
- 25.3 m
- Width
- 18.9 m (62 ft)
- Lanes
- 4
- Daily Traffic
- 8,950
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,138,000
- Total Project Cost
- $1,707,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.