USH B12-MADISON ST over CHIPPEWA RIVER 10

3.6M E JCT USH 12 · County 035, Wisconsin · Built 1924 · 4 Lanes · 16,000 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
6
Satisfactory

Bridge Details

Structure #
B18009100000000
Year Built
1924
Reconstructed
1977
Length
191.6 m (628.6 ft)
Max Span
43 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
16,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.