LRD 330TH ST over GILBERT CREEK

0.1M S JCT STH 29 · County 033, Wisconsin · Built 1995 · 2 Lanes · 170 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
B17014100000000
Year Built
1995
Length
25.1 m (82.3 ft)
Max Span
24.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
170
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.