LRD 550TH AVE over GILBERT CREEK

1.0M S JCT STH 29 · County 033, Wisconsin · Built 1989 · 2 Lanes · 170 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B17012500000000
Year Built
1989
Length
37.2 m (122 ft)
Max Span
15.8 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
170
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.