CTH D over RED CEDAR RIVER

2.8M S JCT STH 25 · County 033, Wisconsin · Built 1975 · 2 Lanes · 1,503 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
9
Excellent
Substructure
4
Poor

Bridge Details

Structure #
B17007800000000
Year Built
1975
Length
84.5 m (277.2 ft)
Max Span
21.1 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
1,503
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$946,000
Total Project Cost
$1,419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.