CTH T over KOSHKONONG CREEK
0.3M W JCT CTH N · County 025, Wisconsin · Built 1939 · 2 Lanes · 1,716 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
43.141639, -89.213333
This bridge is in worse condition than 93.1% of bridges in County 025. The average bridge in Wisconsin is 0 years old; this one is 87 years old.
Nearby Bridges
CTH N over KOSHKONONG CREEK
Built 1957
IH 94 WB over LRD CTH N
Built 2011
IH 94 EB over CTH N
Built 2012
LRD LEARNING PI (M over KOSHKONONG CREEK
Built 2010
CTH TT over KOSHKONONG CREEK
Built 1941
IH 94 WB over LRD GASTON ROAD
Built 2011
USH 151 SB over LRD MAIN ST
Built 1969
IH 94 EB over LRD GASTON ROAD
Built 2012
USH 151 NB over LRD MAIN ST
Built 1969
CTH C/REINER ROAD over USH 151 NB
Built 2005
Bridge Details
- Structure #
- B13048000000000
- Year Built
- 1939
- Length
- 8.7 m (28.5 ft)
- Max Span
- 8.2 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,716
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $141,000
- Total Project Cost
- $211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.