IH 94 EB over LRD GASTON ROAD
2.26 MI. E OF IH 39/90 · County 025, Wisconsin · Built 2012 · 3 Lanes · 23,600 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.104928, -89.245089
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Wisconsin is 0 years old; this one is 14 years old.
Nearby Bridges
IH 94 WB over LRD GASTON ROAD
Built 2011
IH 94 WB over LAND/FUTURE MILWAUKEE ST
Built 2010
IH 94 EB over LRD (FUTURE) MILWAUKEE S
Built 2011
IH 94 WB over LRD SPRECHER RD.
Built 2009
IH 94 EB over LRD SPRECHER RD.
Built 2011
CTH BB over DOOR CREEK
Built 1964
IH 94 EB over IH 90 WB
Built 1996
IH 39 NB/90 WB over IH RAMP IH 94 WB TO IH 9
Built 1997
IH 90 WB-IH 94 WB over CTH T
Built 1997
IH 90 WB over STH 30 EB
Built 1997
Bridge Details
- Structure #
- B13050000000000
- Year Built
- 2012
- Length
- 38.8 m (127.3 ft)
- Max Span
- 37.5 m
- Width
- 19.7 m (64.6 ft)
- Lanes
- 3
- Daily Traffic
- 23,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.