LRD SOUTH TOWNE DR over USH 12/18-S BELTLINE
0.1M S JCT BROADWAY ST · County 025, Wisconsin · Built 1988 · 7 Lanes · 19,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.043622, -89.354069
This bridge is in worse condition than 55.5% of bridges in County 025. The average bridge in Wisconsin is 0 years old; this one is 38 years old.
Nearby Bridges
USH 12/18-W BELTLI over CMSTPP RR
Built 1975
USH 12/18 EB-W BEL over CTH MC (JOHN NOLEN DR.)
Built 1952
USH 12/18 WB BELTL over CTH MC (JOHN NOLEN DR.)
Built 1962
USH 12/18 EB-S BEL over YAHARA RIVER
Built 1988
LRD TECUMSEH AVE over LAGOON DU SUD
Built 1984
LRD MOORLAND RD over NINE SPRINGS CREEK
Built 1997
CTH BW / S BROADWA over YAHARA RIVER
Built 1989
LRD BRIDGE RD over YAHARA RIVER
Built 1967
LRD TECUMSEH AVE over LAGOON DU NORD
Built 1957
LRD WINNEQUAH RD ( over PIRATE ISLAND CHANNEL
Built 2021
Bridge Details
- Structure #
- B13031100000000
- Year Built
- 1988
- Length
- 59.5 m (195.2 ft)
- Max Span
- 29.7 m
- Width
- 36 m (118.1 ft)
- Lanes
- 7
- Daily Traffic
- 19,800
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,021,000
- Total Project Cost
- $1,531,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.