USH 12/18 EB-W BEL over CTH MC (JOHN NOLEN DR.)

1.3M E JCT USH 151 TO N · County 025, Wisconsin · Built 1952 · 5 Lanes · 60,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B13003700000000
Year Built
1952
Reconstructed
1962
Length
44.2 m (145 ft)
Max Span
12.8 m
Width
21.4 m (70.2 ft)
Lanes
5
Daily Traffic
60,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$604,000
Total Project Cost
$907,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.