CTH N over CRAWFISH RIVER

3.1M S JCT STH 60 · County 021, Wisconsin · Built 2014 · 2 Lanes · 268 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B11016400000000
Year Built
2014
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
268
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.