STH 60 over BRANCH CRAWFISH RIVER

900"" W OF CTH N SOUTH · County 021, Wisconsin · Built 1960 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B11012900000000
Year Built
1960
Length
21.2 m (69.6 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
2,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.