LRD CASCADE MOUNTA over IH 90-IH 94
0.6M E JCT STH 33 · County 021, Wisconsin · Built 1961 · 2 Lanes · 60 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.506508, -89.518939
This bridge is in worse condition than 61.5% of bridges in County 021. The average bridge in Wisconsin is 0 years old; this one is 65 years old.
Nearby Bridges
IH 90 WB-IH 94 WB over BARABOO RIVER
Built 2004
IH EB IH90/94 over BARABOO R
Built 2003
STH 33 over IH 90-IH 94
Built 1961
STH 33 over BARABOO RIVER
Built 1961
IH 39 SB over IH 90/94 EB
Built 1993
IH 39 over RAMP STH 78N-IH 90 94 W
Built 1993
IH 39 SB over BARABOO RIVER
Built 1962
IH 39 over STH 78
Built 1993
IH NB IH 39 over BARABOO RIVER
Built 1962
IH STH 78/IH 39 over IH 90/94
Built 1994
Bridge Details
- Structure #
- B11003300000000
- Year Built
- 1961
- Length
- 76.8 m (252 ft)
- Max Span
- 25.1 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 60
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $624,000
- Total Project Cost
- $937,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.