STH 33 over IH 90-IH 94

0.9M E JCT CTH W · County 021, Wisconsin · Built 1961 · 2 Lanes · 6,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B11003000000000
Year Built
1961
Reconstructed
1994
Length
65.2 m (213.9 ft)
Max Span
21.3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
6,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.