LRD CURY CREEK AVE over PANTHER CREEK

0.9M S JCT CTH H · County 019, Wisconsin · Built 2019 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B10023600000000
Year Built
2019
Length
13.6 m (44.6 ft)
Max Span
12.8 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.