CTH H over CAWLEY CREEK

1.2M E JCT STH 73 · County 019, Wisconsin · Built 2014 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B10022200000000
Year Built
2014
Length
32.5 m (106.6 ft)
Max Span
15.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,900
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.