LRD FAIRGROUND AVE over BR POPPLE RIVER

1.9M E JCT STH 73 · County 019, Wisconsin · Built 2005 · 2 Lanes · 105 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B10021500000000
Year Built
2005
Length
11.5 m (37.7 ft)
Max Span
10.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
105
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.