STH 73 over POPPLE RIVER

4.6M N JCT CTH G · County 019, Wisconsin · Built 1985 · 2 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B10007200000000
Year Built
1985
Length
47.5 m (155.8 ft)
Max Span
23.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.