STH 27 over FISHER RIVER

2.1M N JCT CTH W · County 017, Wisconsin · Built 2009 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B09027400000000
Year Built
2009
Length
35.5 m (116.5 ft)
Max Span
17.4 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
4,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.