CTH M over CHIPPEWA RIVER 19

0.5 M W STH 27 · County 017, Wisconsin · Built 1950 · 2 Lanes · 1,070 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B09000300000000
Year Built
1950
Length
243.2 m (797.9 ft)
Max Span
40.5 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
1,070
Material
Steel Continuous
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,634,000
Total Project Cost
$3,951,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.