IH 43 NB OFF RAMP over IH I41 NB
AT 41 NB · County 009, Wisconsin · Built 2015 · 2 Lanes · 13,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.555839, -88.046028
This bridge is in worse condition than 26.6% of bridges in County 009. The average bridge in Wisconsin is 0 years old; this one is 11 years old.
Nearby Bridges
IH 43 NB OFF RAMP over LAND/MAINTENANCE RD
Built 2015
LRD MILITARY AVE over IH 43
Built 1978
IH 41 NB over LRD WEITER WHARF DRIVE
Built 2014
IH 41 SB over LRD WIETOR WHARF DRIVE
Built 2016
IH VELP AVE TO IH over WISCONSIN CENTRAL LTD
Built 2015
IH 41 NB & IH 43 N over IH 41 SB TO IH 43 SB
Built 2015
IH 41 NB over WISCONSIN CENTRAL LTD RR
Built 2015
USH 41 SB OFF-RAMP over LRD WIETOR WHARF DRIVE &
Built 2016
IH 41 SB over WISCONSIN CENTRAL LTD
Built 2016
IH 41 NB OFF RAMP over LRD VELP AVE / USH 141
Built 2015
Bridge Details
- Structure #
- B05067800000000
- Year Built
- 2015
- Length
- 1215.8 m (3988.8 ft)
- Max Span
- 75.3 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 13,000
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,135,000
- Total Project Cost
- $22,702,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.