IH 43 NB OFF RAMP over IH I41 NB

AT 41 NB · County 009, Wisconsin · Built 2015 · 2 Lanes · 13,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B05067800000000
Year Built
2015
Length
1215.8 m (3988.8 ft)
Max Span
75.3 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
13,000
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,135,000
Total Project Cost
$22,702,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.