IH 41 NB OFF RAMP over LRD VELP AVE / USH 141

AT VELP · County 009, Wisconsin · Built 2015 · 2 Lanes · 11,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B05067100000000
Year Built
2015
Length
714.5 m (2344.2 ft)
Max Span
77.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
11,700
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,917,000
Total Project Cost
$13,375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.