IH 41 SB over USH 141/ (VELP AVE)

OVER VELP AVE · County 009, Wisconsin · Built 2016 · 5 Lanes · 26,450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B05066800000000
Year Built
2016
Length
46.4 m (152.2 ft)
Max Span
45.1 m
Width
27.9 m (91.5 ft)
Lanes
5
Daily Traffic
26,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$632,000
Total Project Cost
$948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.