STH 29 EB over CTH PACKERLAND DRIVE (CT

AT STH 29/CTH EB INTERSEC · County 009, Wisconsin · Built 2014 · 3 Lanes · 16,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B05065700000000
Year Built
2014
Length
77.4 m (253.9 ft)
Max Span
38.1 m
Width
20.5 m (67.3 ft)
Lanes
3
Daily Traffic
16,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.