IH STH 29 EB RAMP over LRD DUCK CREEK PKWY

AT DUCK CREEK PKWY · County 009, Wisconsin · Built 2012 · 2 Lanes · 9,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B05066300000000
Year Built
2012
Length
32.9 m (107.9 ft)
Max Span
29.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
9,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.