CTH J over SUAMICO RIVER

0.2M S JCT CTH B · County 009, Wisconsin · Built 2020 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B05044300000000
Year Built
2020
Length
26.7 m (87.6 ft)
Max Span
25.9 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.