LRD RIVERSIDE DR over SUAMICO RIVER

0.5M S JCT CTH B · County 009, Wisconsin · Built 1926 · 2 Lanes · 592 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P05003400000000
Year Built
1926
Reconstructed
1974
Length
14.6 m (47.9 ft)
Max Span
14 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
592
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.