CTH ZZ EILER ROA over EAST RIVER

0.1M W JCT STH 57 · County 009, Wisconsin · Built 2018 · 2 Lanes · 2,150 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B05042200000000
Year Built
2018
Length
24.6 m (80.7 ft)
Max Span
23.5 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
2,150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.