LRD MALLARD RD over EAST RIVER

1.02M W JCT STH 57 · County 009, Wisconsin · Built 2020 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B05047300000000
Year Built
2020
Length
13 m (42.7 ft)
Max Span
13 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.