STH 172 EB over CTH AAA ONEIDA ST

0.6M E JCT IH 41 · County 009, Wisconsin · Built 2010 · 4 Lanes · 32,450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B05038600000000
Year Built
2010
Length
53.8 m (176.5 ft)
Max Span
17.4 m
Width
23.7 m (77.8 ft)
Lanes
4
Daily Traffic
32,450
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.