STH 172 WB over LRD HOLMGREN WAY

1.6M W JCT STH 57 · County 009, Wisconsin · Built 1998 · 3 Lanes · 32,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B05033300000000
Year Built
1998
Length
45.1 m (148 ft)
Max Span
12.7 m
Width
22.1 m (72.5 ft)
Lanes
3
Daily Traffic
32,450
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.