CTH O (ALLOUEZ AVE over WILLOW CREEK

0.2M EAST OF CTH XX · County 009, Wisconsin · Built 2005 · 3 Lanes · 10,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B05035500000000
Year Built
2005
Length
6.1 m (20 ft)
Max Span
6.1 m
Lanes
3
Daily Traffic
10,500
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.