CTH O ALLOUEZ AV over EAST RIVER

0.9M E JCT CTH X · County 009, Wisconsin · Built 2002 · 2 Lanes · 12,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B05035000000000
Year Built
2002
Length
82 m (269 ft)
Max Span
18.3 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
12,200
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.