STH 25 over UPPER PINE CREEK

4.2M N JCT CTH A TO E · County 005, Wisconsin · Built 1976 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B03006900000000
Year Built
1976
Reconstructed
2017
Length
16.4 m (53.8 ft)
Max Span
15.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.